Martyrs' Mosque

Project Detail

Martyrs' Mosque

New Administrative Capital

The Challenge / The Response

The Challenge

Building a civic-scale mosque inside a greenfield capital where shared-site logistics, concurrent infrastructure works, and tight NAC handover dates all converged on the same programme.

The Response

Opal phased structural, MEP, and finishing works on a rolling stage-gate cadence so every trade could progress without waiting on shared-site access.

About this project

Martyrs' Mosque is a landmark religious commission delivered in Egypt's New Administrative Capital — a city built from the ground up to serve as the nation's future seat of government and public life. Opal was contracted by the Armed Forces Engineering Authority to deliver a mosque of both spiritual and civic scale, accommodating 3,000 worshippers. The project required precise coordination of structural, MEP, and heritage-grade finishing works across the entire building envelope.

Technical Scope

Mosque with capacity of 3,000 worshippers.

Key Project Metrics

3,000
Worshipper Capacity
NAC
New Administrative Capital
AFEA
Commissioning Authority

Technical summary

~6,200 m²

Gross floor area

Ground + gallery level

Floor configuration

240 peak

Peak crew

Cast-in-place concrete with stone-clad façade

Material note

Commissioning Authority

Ministry of Defense – Armed Forces Engineering Authority

Opal has maintained a trusted working relationship with the Armed Forces Engineering Authority and the Ministry of Housing across numerous landmark programmes.

Discuss a Similar Project

Delivered by Opal

Construction excellence on every site

Every Opal site operates under strict HSE protocols, senior engineering oversight, and structured stage-gate quality checkpoints.

Senior engineers on site

Our most experienced people live on the project — not on a dashboard in a boardroom.

Stage-gate quality control

Structured QA/QC checkpoints, weekly client reporting, and documented handover packages.

Schedule as a commitment

Planning-team discipline, realistic buffers, and transparent status updates throughout.

Location

Where this project sits.

Approximate district-level location.

Portfolio

Explore the full portfolio

From landmark mosques to 90-block residential compounds — browse four decades of delivered projects.